Franklin PUD & Benton PUD Electric Rates Hike: What You Need to Know in 2027 (2026)

Franklin PUD and Benton PUD Electric Rate Increases on the Horizon

Residents of Pasco, Washington, may soon face higher electric bills as the Franklin Public Utility District (PUD) and Benton PUD consider rate increases. The proposed changes aim to address rising costs and ensure the sustainability of power supply.

Franklin PUD's Rate Increase Scenarios

The Franklin PUD Commission is evaluating two scenarios for residential rate increases. The first scenario, dubbed "Scenario 1," proposes a 3% rate increase starting on January 1, 2027, resulting in an annual increase of $42.24 for the average household. This option is expected to require a larger 7.5% increase in May 2028, followed by 3% increases for the subsequent three years.

"Scenario 2" suggests a 4.7% increase, effective May 1, 2027, leading to an annual increase of $44.88 for the average home. According to PUD calculations, this scenario is projected to provide a more consistent rate increase in the following years.

Both scenarios would also apply similar percentage increases to other customer classes, such as industrial and irrigation.

Factors Influencing Rate Increases

The Franklin PUD attributes the potential rate hikes to several factors, including:

  • Increased wholesale power costs, the PUD's largest expense.
  • A federal court order mandating higher water spillage over Columbia and Snake River dams to aid salmon, which has impacted the PUD's electricity production.
  • Rising labor and material costs beyond historic inflation levels.
  • Uncertainty surrounding state requirements for renewable and carbon-free energy.

Rate Advisory Committee's Recommendation

The Franklin PUD's rate advisory committee, comprising customers from various rate classes, has recommended "Scenario 2" as a more stable and manageable option for customers. This scenario aims to provide a more level rate increase over the long term.

Benton PUD's Rate Increase Proposal

The Benton PUD Commission is also considering a rate increase, with a proposal expected to be released later this month. A public hearing and comment period are scheduled for November 10, 2027.

Public Engagement and Decision-Making

The Franklin PUD held public hearings last week, providing an opportunity for residents to voice their opinions and concerns. Commissioners Roger Write and Pedro Torres have indicated their preference for "Scenario 2," while Commissioner Bill Gordon has not yet declared a preference. The final decision is expected to be made at the October 27 meeting, with the new rate schedule to be adopted in November.

Written comments can be submitted via mail or email until the October 27 meeting, or residents can attend the meeting in person to provide their input.

For more information and to review the public hearing presentation, visit bit.ly/4yUFKEb.


Article by Annette Cary, Senior Staff Writer at the Tri-City Herald. Cary has been a news reporter for over 30 years in the Pacific Northwest. To support her work, consider subscribing to the Tri-City Herald at https://mycheckout.tri-cityherald.com/subscribe?ofrgpid=394&g2ioro=Event&g2iorp=Reporter&cid=newscta0.99-1mo-15.99-on-article202404.

Franklin PUD & Benton PUD Electric Rates Hike: What You Need to Know in 2027 (2026)

References

Top Articles
Latest Posts
Recommended Articles
Article information

Author: Errol Quitzon

Last Updated:

Views: 5793

Rating: 4.9 / 5 (59 voted)

Reviews: 90% of readers found this page helpful

Author information

Name: Errol Quitzon

Birthday: 1993-04-02

Address: 70604 Haley Lane, Port Weldonside, TN 99233-0942

Phone: +9665282866296

Job: Product Retail Agent

Hobby: Computer programming, Horseback riding, Hooping, Dance, Ice skating, Backpacking, Rafting

Introduction: My name is Errol Quitzon, I am a fair, cute, fancy, clean, attractive, sparkling, kind person who loves writing and wants to share my knowledge and understanding with you.